New Build Checkpoints logo — a house frame with a checkmark at its peakNew Build CheckpointsWhat gets checked as a new house goes up
Category one

Stages checked at a code inspection

These are the stages a code inspection is built around: the points at which the building department, or the engineer it relies on, is supposed to see the work before it is covered. Under Section R109 of the International Residential Code, the building official inspects the foundation before concrete, the plumbing, mechanical, gas and electrical rough-ins before concealment, the framing after the rough-ins pass, and the finished house before occupancy. Cities split these into more visits and add their own, such as an insulation inspection or an energy final.

Overview

What a code inspection gives a buyer

A code inspection gives a buyer two things. First, a defined check against minimum requirements at the moment that matters most for that stage: the drain lines holding a 10-foot column of water before the slab covers them, the steel and vapor retarder in place before the pour, the framing intact after the trades have drilled through it. Second, a record. The permit history shows which inspections were requested, passed, failed and repeated, and many cities publish it online by address.

What it does not give

A code inspection is a floor, written for safety, and it is a sample rather than a census: an inspector checks representative work, not every fastener. It does not evaluate workmanship that meets no code requirement, and it does not warrant the house. It also depends on the jurisdiction. Austin, for example, leaves foundation inspections on new construction to the design engineer, and outside city limits in Texas the builder hires the inspectors from a list set by statute. The guide to what a city building inspector checks explains the system in full.

Most of these stages are hidden by the stage that follows. The table shows which: the under-slab plumbing and the foundation are hidden for good at the pour; the framing, the rough-ins and the insulation are partly or wholly hidden at drywall; only the final grade and the final inspection itself remain fully checkable later.

Reading the permit record

The permit record is the most useful public document a buyer can obtain for these stages. It lists each inspection the builder requested, the result, and the date, including failures and re-inspections. Three patterns are worth noticing. A stage that failed and passed on re-inspection tells you where the builder had to correct work, which is normal and often reassuring. A stage with no recorded inspection, in a jurisdiction that requires one, is a question to put to the builder and the city. And an inspection recorded as passed on the same day as the next stage began suggests how short the window was; it is worth knowing when deciding whether an independent look at that stage would have been possible.

When the engineer stands in for the city

On many slab-on-grade houses, particularly engineered slabs on expansive clay, the design engineer's pre-pour observation and letter carry more information than the city's foundation inspection, because the engineer checks the steel or tendons against the engineer's own drawings. Where a city relies on the engineer entirely, the letter is the inspection record. Ask for it by name, along with the post-tension elongation record if the slab is post-tensioned; both belong with the closing documents.

What a passed inspection does not mean

A passed code inspection means the work met the inspector's reading of the adopted code on the day of the visit, within the time the inspector had. It is not a warranty, it is not a check of workmanship beyond the code, and it does not cover anything installed after the visit. Municipal inspectors typically visit many sites a day and look at the items the code makes them responsible for. That is a real safeguard, and it is the reason a stage marked as code-inspected is still worth asking about by name: what was checked, by whom, and whether anything failed first.

The permit record for a finished house is usually public and free to request.

Whether each construction stage can still be checked after move-in, and which phase it belongs to
StageAfter move-inPhase
Under-Slab Plumbing and the Water TestHidden once the next stage startsSite and foundation
The Foundation Pre-Pour InspectionHidden once the next stage startsSite and foundation
The Framing Inspection and Wall BracingPartly hidden after completionStructure and shell
Plumbing Top-Out and the Gas Line TestHidden once the next stage startsSystems rough-in
The Electrical Rough-In InspectionPartly hidden after completionSystems rough-in
HVAC Rough-In and Equipment SizingPartly hidden after completionSystems rough-in
Insulation and Air Sealing Before DrywallPartly hidden after completionSystems rough-in
Final Grading and DrainageStill checkable after move-inCompletion
The Final Inspection and Certificate of OccupancyStill checkable after move-inCompletion
All 9

Code-inspected stages, by phase


Systems rough-in

4 stages

Plumbing, wiring, ducts and insulation inside the walls, and the tests that measure them.