What the pre-pour inspection establishes
The foundation pre-pour inspection establishes that the parts of the foundation that will be buried were in place, and arranged as designed, before concrete was placed. Under Section R109.1.1 of the International Residential Code (IRC), the foundation inspection is made after trenches are excavated, any required forms erected and any required reinforcing steel in place, and before the pour. Everything the inspector looks at ends up inside or underneath concrete. After the pour, nothing on this list can be seen again.
On a typical Texas slab, the checklist covers the beams (the deeper trenches around the perimeter and under bearing walls), the reinforcing steel or post-tension cables, the vapor retarder (the plastic sheet under the slab), the anchor bolts that will tie the walls to the slab, and every pipe, sleeve and conduit that passes through it.
The numbers the code sets
Section R506 of the IRC sets the minimums for a slab on ground: at least 3.5 inches of concrete, usually over a 4-inch base course, with a 6-mil polyethylene vapor retarder between the slab and the base, joints lapped at least 6 inches. In practice, most residential slabs are thicker, and engineered slabs on expansive Texas clay follow the engineer's drawings rather than the code minimum.
Anchor bolts, which hold the bottom plate of the walls to the foundation, are at least 1/2 inch in diameter, embedded at least 7 inches in the concrete, within 12 inches of each end of a plate, and spaced no more than 6 feet apart. A missing anchor bolt can be added later with an epoxy anchor. A missing vapor retarder cannot.
The grounding electrode inside the footing
One item buyers never hear about sits in this inspection: the concrete-encased electrode, often called a Ufer ground after the engineer who developed it. Under the National Electrical Code, at least 20 feet of 1/2-inch reinforcing bar, or bare copper wire of at least 4 AWG, encased in at least 2 inches of concrete near the bottom of a footing in contact with the earth, serves as an electrode for the house's electrical grounding. Some jurisdictions, such as Henrico County, Virginia, require it to be inspected before the concrete is placed. Austin's checklist notes that the footing must be free of plastic or other insulating material where the electrode sits, because a vapor retarder between the steel and the soil defeats it.
Who actually does the inspecting
This is where practice departs from the model code. Many cities inspect the foundation themselves. Others rely on the engineer who designed it. Austin's residential foundation checklist states plainly that city inspectors will not perform foundation inspections for new construction; the design engineer's letter documents compliance instead. On an engineered slab, the engineer's own pre-pour observation and letter are often the more meaningful record, because the engineer is checking the steel against the engineer's own drawings.
Outside city limits in Texas, the builder must arrange a foundation-stage inspection before concrete is placed, from a list of permitted inspectors that includes licensed engineers and TREC-licensed inspectors; see the guide to new construction outside city limits.
What the inspection does not establish
It does not establish soil conditions. The design of a slab on expansive clay depends on a geotechnical report, and the inspection checks construction against the design, not the design against the soil. It does not establish concrete quality. The strength of the concrete delivered and how it was placed and cured happen after the inspector leaves. And on a post-tensioned slab, it does not establish that the cables were stressed correctly, which happens days later.
Common mistakes
Torn vapor retarder is the classic. The sheet is laid, then walked on by crews setting steel and plumbing, and holes left unpatched let ground moisture into the slab and the flooring above it. Steel resting directly on the ground, rather than on chairs that hold it up in the concrete, is the second; steel needs concrete cover to work and to resist corrosion. The third is plumbing sleeves and penetrations in the wrong place, found only when the walls go up. The fourth is pouring before the under-slab plumbing test is confirmed holding.
Reading the record
A buyer can ask for three things: the city's inspection result for the foundation stage, the engineer's pre-pour letter if the slab is engineered, and the form board survey if the city required one. Together they say the slab was placed where it belongs and built as designed. None of them says how the slab will perform, which depends on soil moisture and drainage for the life of the house.
Where the rules come from
The slab minimums appear in plain form on county code handouts such as Warren County, Kentucky's slab-on-grade cross-section. The electrode rule is explained in New Jersey's bulletin on concrete-encased electrodes, and Austin's position on foundation inspections is on its foundation inspection checklist.