      "entityId": "e_lot_survey_and_form_board",
      "@type": "Thing",
      "name": "Form Board Survey and Staking",
      "alternateName": "Form board survey",
      "description": "Some cities require a surveyor to confirm the forms sit inside the setbacks and easements before the pour. After that, the slab's position is permanent.",
      "hasChunks": [
        {
          "chunkId": "c_lot-survey-and-form-board",
          "text": "A form board survey establishes one thing: that the wooden forms holding the future foundation sit where the approved plot plan says they should, inside the lot's building lines and clear of its easements. It is a measurement, signed by a licensed land surveyor, taken after the forms are set and before the concrete is placed. Once the slab is poured, the position of the house on the lot is fixed for good, which is why this small document carries more weight than its length suggests. The terms vary by region.",
          "sourceUrl": "https://www.homepointinspection.com/lot-survey-and-form-board/",
          "pageTitle": "Form Board Survey and Staking | New Build Checkpoints",
          "publisher": "New Build Checkpoints",
          "contentType": "definition"
        }
      ],
      "relations": [
        {
          "predicate": "PART_OF",
          "target": "e_grp_site",
          "targetId": "e_grp_site",
          "targetName": "Site and foundation",
          "confidence": "declared"
        }
      ]
    },
    {
      "entityId": "e_termite_pretreatment",
      "@type": "Thing",
      "name": "Termite Pretreatment",
      "alternateName": "Termite pretreatment",
      "description": "Applied to the soil before the concrete and never seen again, so the certificate or affidavit is the only evidence it happened.",
      "hasChunks": [
        {
          "chunkId": "c_termite-pretreatment",
          "text": "A termite pretreatment establishes that a barrier against subterranean termites was put in place while the ground under the house was still exposed. Most often it is a liquid termiticide applied to the prepared soil just before the slab is poured; it can also be a physical barrier or a bait system. Once the concrete is down, the treated soil is sealed underneath and nobody, including the next inspector, can confirm the barrier by looking. The certificate or affidavit is the evidence.",
          "sourceUrl": "https://www.homepointinspection.com/termite-pretreatment/",
          "pageTitle": "Termite Pretreatment | New Build Checkpoints",
          "publisher": "New Build Checkpoints",
          "contentType": "definition"
        }
      ],
      "relations": [
        {
          "predicate": "PART_OF",
          "target": "e_grp_site",
          "targetId": "e_grp_site",
          "targetName": "Site and foundation",
          "confidence": "declared"
        },
        {
          "predicate": "RELATES_TO",
          "target": "e_c_termite",
          "targetId": "e_c_termite",
          "targetName": "Termite",
          "targetUri": "https://en.wikipedia.org/wiki/Termite",
          "confidence": "declared"
        }
      ]
    },
    {
      "entityId": "e_under_slab_plumbing",
      "@type": "Thing",
      "name": "Under-Slab Plumbing and the Water Test",
      "alternateName": "Under-slab plumbing",
      "description": "The only look anyone gets at the pipes under a slab house. The 2021 IRC tests them with a 10-foot head of water for 15 minutes.",
      "hasChunks": [
        {
          "chunkId": "c_under-slab-plumbing",
          "text": "The under-slab plumbing test establishes that the drain lines buried beneath a new house held water without leaking on the day they were inspected. It is the most consequential plumbing test in slab construction because it is the only one done while the pipes can still be seen. Once concrete is placed, a leak under the slab can only be found by indirect means and fixed by breaking the slab or tunneling under it. Plumbers call this stage groundwork , underground or rough-in below slab .",
          "sourceUrl": "https://www.homepointinspection.com/under-slab-plumbing/",
          "pageTitle": "Under-Slab Plumbing and the Water Test | New Build Checkpoints",
          "publisher": "New Build Checkpoints",
          "contentType": "definition"
        }
      ],
      "relations": [
        {
          "predicate": "PART_OF",
          "target": "e_grp_site",
          "targetId": "e_grp_site",
          "targetName": "Site and foundation",
          "confidence": "declared"
        }
      ]
    },
    {
      "entityId": "e_foundation_pre_pour",
      "@type": "Thing",
      "name": "The Foundation Pre-Pour Inspection",
      "alternateName": "Foundation pre-pour",
      "description": "Everything the inspector or engineer checks ends up inside or under concrete. Some cities, including Austin, leave this stage to the engineer.",
      "hasChunks": [
        {
          "chunkId": "c_foundation-pre-pour",
          "text": "The foundation pre-pour inspection establishes that the parts of the foundation that will be buried were in place, and arranged as designed, before concrete was placed. Under Section R109.1.1 of the International Residential Code (IRC), the foundation inspection is made after trenches are excavated, any required forms erected and any required reinforcing steel in place, and before the pour. Everything the inspector looks at ends up inside or underneath concrete. After the pour, nothing on this list can be seen again.",
          "sourceUrl": "https://www.homepointinspection.com/foundation-pre-pour/",
          "pageTitle": "The Foundation Pre-Pour Inspection | New Build Checkpoints",
          "publisher": "New Build Checkpoints",
          "contentType": "definition"
        }
      ],
      "relations": [
        {
          "predicate": "PART_OF",
          "target": "e_grp_site",
          "targetId": "e_grp_site",
          "targetName": "Site and foundation",
          "confidence": "declared"
        }
      ]
    },
    {
      "entityId": "e_post_tension_stressing",
      "@type": "Thing",
      "name": "Post-Tension Slab Stressing",
      "alternateName": "Post-tension stressing",
      "description": "The cables are stretched and their tails cut. A one-page elongation record is the only proof each one reached its design length.",
      "hasChunks": [
        {
          "chunkId": "c_post-tension-stressing",
          "text": "Stressing establishes that the steel cables cast into a post-tensioned slab were stretched to the force the engineer designed, as measured by how far each one elongated. A post-tensioned slab uses a grid of high-strength steel cables, called tendons , encased in plastic sheathing and laid through the slab before the pour. Days later, after the concrete gains strength, a crew pulls each tendon with a hydraulic jack and locks it off at the slab edge.",
          "sourceUrl": "https://www.homepointinspection.com/post-tension-stressing/",
          "pageTitle": "Post-Tension Slab Stressing | New Build Checkpoints",
          "publisher": "New Build Checkpoints",
          "contentType": "definition"
        }
      ],
      "relations": [
        {
          "predicate": "PART_OF",
          "target": "e_grp_site",
          "targetId": "e_grp_site",
          "targetName": "Site and foundation",
          "confidence": "declared"
        },
        {
          "predicate": "RELATES_TO",
          "target": "e_c_prestressed",
          "targetId": "e_c_prestressed",
          "targetName": "Prestressed concrete",
          "targetUri": "https://en.wikipedia.org/wiki/Prestressed_concrete",
          "confidence": "declared"
        }
      ]
    },
    {
      "entityId": "e_framing_and_bracing",
      "@type": "Thing",
      "name": "The Framing Inspection and Wall Bracing",
      "alternateName": "Framing inspection",
      "description": "Usually the code inspector's last look at the structure. It follows the rough-ins so it can catch framing the trades cut too deeply.",
      "hasChunks": [
        {
          "chunkId": "c_framing-and-bracing",
          "text": "The framing inspection establishes that the house's structural skeleton, the walls, floors and roof framing and the connections between them, was built to the approved plans and the building code before insulation and drywall covered it. Under Section R109.1.4 of the International Residential Code (IRC), it is made after the roof, framing, firestopping, draftstopping and bracing are in place, and after the plumbing, mechanical and electrical rough inspections are approved.",
          "sourceUrl": "https://www.homepointinspection.com/framing-and-bracing/",
          "pageTitle": "The Framing Inspection and Wall Bracing | New Build Checkpoints",
          "publisher": "New Build Checkpoints",
          "contentType": "definition"
        }
      ],
      "relations": [
        {
          "predicate": "PART_OF",
          "target": "e_grp_shell",
          "targetId": "e_grp_shell",
          "targetName": "Structure and shell",
          "confidence": "declared"
        },
        {
          "predicate": "RELATES_TO",
          "target": "e_c_icc",
          "targetId": "e_c_icc",
          "targetName": "International Code Council",
          "targetUri": "https://en.wikipedia.org/wiki/International_Code_Council",
          "confidence": "declared"
        }
      ]
    },
    {
      "entityId": "e_roof_dry_in",
      "@type": "Thing",
      "name": "Roof Dry-In: Underlayment and Flashing",
      "alternateName": "Roof dry-in",
      "description": "Underlayment and flashing decide whether a roof leaks, and in most places no code inspection is aimed at them before the shingles cover them.",
      "hasChunks": [
        {
          "chunkId": "c_roof-dry-in",
          "text": "Dry-in is the point at which a new house is closed to rain: the roof deck is covered with underlayment and flashing, and usually the windows and exterior doors are set and the walls wrapped. It establishes that the interior can now be worked on without weather damage. It does not, on its own, establish that the roof will shed water for decades. That depends on details installed during dry-in and then covered by the shingles, tile or metal on top. Builders track dry-in as a schedule milestone.",
          "sourceUrl": "https://www.homepointinspection.com/roof-dry-in/",
          "pageTitle": "Roof Dry-In: Underlayment and Flashing | New Build Checkpoints",
          "publisher": "New Build Checkpoints",
          "contentType": "definition"
        }
      ],
      "relations": [
        {
          "predicate": "PART_OF",
          "target": "e_grp_shell",
          "targetId": "e_grp_shell",
          "targetName": "Structure and shell",
          "confidence": "declared"
        }
      ]
    },
    {
      "entityId": "e_windows_and_weather_barrier",
      "@type": "Thing",
      "name": "Windows, Flashing and Weather Barrier",
      "alternateName": "Windows and weather barrier",
      "description": "One reversed lap at a window head can send water into the wall from the first storm, and the cladding hides it for good.",
      "hasChunks": [
        {
          "chunkId": "c_windows-and-weather-barrier",
          "text": "The weather-resistive barrier (WRB) is a sheet material, most often house wrap or building paper, applied over the wall sheathing before the siding, stucco or brick. Flashing around each window and door ties that barrier to the opening so water running down the wall is directed out, not in. Installed correctly, they establish a drainage plane: a surface behind the cladding that sheds whatever water gets past the outer layer.",
          "sourceUrl": "https://www.homepointinspection.com/windows-and-weather-barrier/",
          "pageTitle": "Windows, Flashing and Weather Barrier | New Build Checkpoints",
          "publisher": "New Build Checkpoints",
          "contentType": "definition"
        }
      ],
      "relations": [
        {
          "predicate": "PART_OF",
          "target": "e_grp_shell",
          "targetId": "e_grp_shell",
          "targetName": "Structure and shell",
          "confidence": "declared"
        },
        {
          "predicate": "RELATES_TO",
          "target": "e_c_housewrap",
          "targetId": "e_c_housewrap",
          "targetName": "Housewrap",
          "targetUri": "https://en.wikipedia.org/wiki/Housewrap",
          "confidence": "declared"
        }
      ]
    },
    {
      "entityId": "e_brick_veneer",
      "@type": "Thing",
      "name": "Brick Veneer: Weep Holes, Ties and Air Space",
      "alternateName": "Brick veneer",
      "description": "Weep holes every 33 inches at most, a 1-inch air space and metal ties. The ties are often only spot-checked because they are hidden as the brick rises.",
      "hasChunks": [
        {
          "chunkId": "c_brick-veneer",
          "text": "On most new Texas houses, the brick is veneer : a single layer, or wythe, of brick standing in front of a wood-framed wall and attached to it with metal ties. It carries no load from the house. It is a cladding, and like any cladding it lets some water through. The design that makes it work is a drainage system behind the brick: an air space, a weather-resistive barrier on the sheathing, flashing at the base and over openings, and weep holes that let water out.",
          "sourceUrl": "https://www.homepointinspection.com/brick-veneer/",
          "pageTitle": "Brick Veneer: Weep Holes, Ties and Air Space | New Build Checkpoints",
          "publisher": "New Build Checkpoints",
          "contentType": "definition"
        }
      ],
      "relations": [
        {
          "predicate": "PART_OF",
          "target": "e_grp_shell",
          "targetId": "e_grp_shell",
          "targetName": "Structure and shell",
          "confidence": "declared"
        }
      ]
    },
    {
      "entityId": "e_plumbing_top_out",
      "@type": "Thing",
      "name": "Plumbing Top-Out and the Gas Line Test",
      "alternateName": "Plumbing top-out",
      "description": "Drains, vents, supply lines and gas piping are tested and inspected while they can still be reached, including the bonding of CSST gas tubing.",
      "hasChunks": [
        {
          "chunkId": "c_plumbing-top-out",
          "text": "Top-out is the plumbing trade's name for the rough plumbing installed above the slab, inside walls and ceilings: the drain and vent pipes rising to the roof, the hot and cold supply lines to each fixture location, and usually the gas piping. The top-out inspection establishes that this piping was installed and tested tight before it was concealed.",
          "sourceUrl": "https://www.homepointinspection.com/plumbing-top-out/",
          "pageTitle": "Plumbing Top-Out and the Gas Line Test | New Build Checkpoints",
          "publisher": "New Build Checkpoints",
          "contentType": "definition"
        }
      ],
      "relations": [
        {
          "predicate": "PART_OF",
          "target": "e_grp_systems",
          "targetId": "e_grp_systems",
          "targetName": "Systems rough-in",
          "confidence": "declared"
        }
      ]
    },
    {
      "entityId": "e_electrical_rough_in",
      "@type": "Thing",
      "name": "The Electrical Rough-In Inspection",
      "alternateName": "Electrical rough-in",
      "description": "The only time anyone sees how the wiring is run and protected. The panel and devices stay visible; the cable runs do not.",
      "hasChunks": [
        {
          "chunkId": "c_electrical-rough-in",
          "text": "The electrical rough-in inspection establishes that the house's wiring was installed in the walls and ceilings in a safe, code-compliant arrangement before it was covered. At this stage the house shows only boxes, cables and the empty panel. The inspector checks how cables are routed, supported and protected, that boxes are the right size for the conductors they hold, and that grounding and bonding paths are in place.",
          "sourceUrl": "https://www.homepointinspection.com/electrical-rough-in/",
          "pageTitle": "The Electrical Rough-In Inspection | New Build Checkpoints",
          "publisher": "New Build Checkpoints",
          "contentType": "definition"
        }
      ],
      "relations": [
        {
          "predicate": "PART_OF",
          "target": "e_grp_systems",
          "targetId": "e_grp_systems",
          "targetName": "Systems rough-in",
          "confidence": "declared"
        }
      ]
    },
    {
      "entityId": "e_hvac_rough_in",
      "@type": "Thing",
      "name": "HVAC Rough-In and Equipment Sizing",
      "alternateName": "HVAC rough-in",
      "description": "The code requires Manual J loads and Manual S equipment selection. Whether anyone checks it depends on the city.",
      "hasChunks": [
        {
          "chunkId": "c_hvac-rough-in",
          "text": "The mechanical rough-in establishes that the heating, cooling and ventilation system's concealed parts are in place before walls and ceilings close: the duct runs and the boots (the fittings that connect ducts to the registers), return air paths, refrigerant line sets, flues for gas appliances, and exhaust fan ducts for bathrooms and the kitchen. Wake County, North Carolina, asks builders to request it when all boots, gas piping and tests, mechanical ventilation and concealed ducts are installed.",
          "sourceUrl": "https://www.homepointinspection.com/hvac-rough-in/",
          "pageTitle": "HVAC Rough-In and Equipment Sizing | New Build Checkpoints",
          "publisher": "New Build Checkpoints",
          "contentType": "definition"
        }
      ],
      "relations": [
        {
          "predicate": "PART_OF",
          "target": "e_grp_systems",
          "targetId": "e_grp_systems",
          "targetName": "Systems rough-in",
          "confidence": "declared"
        }
      ]
    },
    {
      "entityId": "e_insulation_and_air_sealing",
      "@type": "Thing",
      "name": "Insulation and Air Sealing Before Drywall",
      "alternateName": "Insulation and air sealing",
      "description": "Attic insulation can be fixed later at modest cost. Wall insulation and top-plate air sealing effectively cannot.",
      "hasChunks": [
        {
          "chunkId": "c_insulation-and-air-sealing",
          "text": "This stage establishes that the thermal envelope , the boundary between conditioned indoor space and the outdoors or unconditioned attic, was insulated and sealed as designed. Wall insulation goes into the stud cavities after the rough-ins and the framing inspection pass, and air sealing closes the gaps around wiring, plumbing and duct penetrations, top plates and the rim. Then drywall goes up and covers both. Some jurisdictions inspect insulation separately; Groton, Connecticut, for example, lists an insulation inspection between framing and final.",
          "sourceUrl": "https://www.homepointinspection.com/insulation-and-air-sealing/",
          "pageTitle": "Insulation and Air Sealing Before Drywall | New Build Checkpoints",
          "publisher": "New Build Checkpoints",
          "contentType": "definition"
        }
      ],
      "relations": [
        {
          "predicate": "PART_OF",
          "target": "e_grp_systems",
          "targetId": "e_grp_systems",
          "targetName": "Systems rough-in",
          "confidence": "declared"
        }
      ]
    },
    {
      "entityId": "e_energy_code_testing",
      "@type": "Thing",
      "name": "Blower Door and Duct Leakage Testing",
      "alternateName": "Energy code testing",
      "description": "The one hidden-stage quality that can be measured again after move-in. The results belong on a certificate at the electrical panel.",
      "hasChunks": [
        {
          "chunkId": "c_energy-code-testing",
          "text": "The blower door test establishes how much air leaks through the house's envelope; the duct leakage test establishes how much air leaks out of the heating and cooling ducts. Both turn construction quality that nobody can see, the air sealing at top plates, penetrations and rim joists, and the sealing of duct joints, into numbers. That makes this stage unusual. Almost every other step in building a house is judged by looking at it before it is covered. This one is judged by measurement, and the measurement can be repeated at any time after move-in.",
          "sourceUrl": "https://www.homepointinspection.com/energy-code-testing/",
          "pageTitle": "Blower Door and Duct Leakage Testing | New Build Checkpoints",
          "publisher": "New Build Checkpoints",
          "contentType": "definition"
        }
      ],
      "relations": [
        {
          "predicate": "PART_OF",
          "target": "e_grp_systems",
          "targetId": "e_grp_systems",
          "targetName": "Systems rough-in",
          "confidence": "declared"
        },
        {
          "predicate": "RELATES_TO",
          "target": "e_c_blower",
          "targetId": "e_c_blower",
          "targetName": "Blower door",
          "targetUri": "https://en.wikipedia.org/wiki/Blower_door",
          "confidence": "declared"
        },
        {
          "predicate": "RELATES_TO",
          "target": "e_c_icc",
          "targetId": "e_c_icc",
          "targetName": "International Code Council",
          "targetUri": "https://en.wikipedia.org/wiki/International_Code_Council",
          "confidence": "declared"
        }
      ]
    },
    {
      "entityId": "e_final_grading_and_drainage",
      "@type": "Thing",
      "name": "Final Grading and Drainage",
      "alternateName": "Final grading",
      "description": "The most checkable rule on this site, and the one owners undo most often with flowerbeds, patios and fences.",
      "hasChunks": [
        {
          "chunkId": "c_final-grading-and-drainage",
          "text": "Final grading establishes that the ground around a new house slopes away from it, so rainwater runs off rather than collecting against the foundation. Section R401.3 of the International Residential Code (IRC) states the rule plainly: lots are graded to drain surface water away from foundation walls, and the grade falls a minimum of 6 inches within the first 10 feet. Where lot lines, walls, slopes or other barriers make that impossible, drains or swales must carry water away instead.",
          "sourceUrl": "https://www.homepointinspection.com/final-grading-and-drainage/",
          "pageTitle": "Final Grading and Drainage | New Build Checkpoints",
          "publisher": "New Build Checkpoints",
          "contentType": "definition"
        }
      ],
      "relations": [
        {
          "predicate": "PART_OF",
          "target": "e_grp_finish",
          "targetId": "e_grp_finish",
          "targetName": "Completion",
          "confidence": "declared"
        }
      ]
    },
    {
      "entityId": "e_final_inspection_and_co",
      "@type": "Thing",
      "name": "The Final Inspection and Certificate of Occupancy",
      "alternateName": "Final inspection and CO",
      "description": "The certificate records passed inspections and the code edition. It does not say the house is free of defects.",
      "hasChunks": [
        {
          "chunkId": "c_final-inspection-and-co",
          "text": "The final inspection establishes that the building department found the completed house compliant enough with the adopted code to be occupied. Under Section R110.1 of the International Residential Code (IRC), no building may be used or occupied until the building official issues a certificate of occupancy (CO) .",
          "sourceUrl": "https://www.homepointinspection.com/final-inspection-and-co/",
          "pageTitle": "The Final Inspection and Certificate of Occupancy | New Build Checkpoints",
          "publisher": "New Build Checkpoints",
          "contentType": "definition"
        }
      ],
      "relations": [
        {
          "predicate": "PART_OF",
          "target": "e_grp_finish",
          "targetId": "e_grp_finish",
          "targetName": "Completion",
          "confidence": "declared"
        },
        {
          "predicate": "RELATES_TO",
          "target": "e_c_co",
          "targetId": "e_c_co",
          "targetName": "Certificate of occupancy",
          "targetUri": "https://en.wikipedia.org/wiki/Certificate_of_occupancy",
          "confidence": "declared"
        },
        {
          "predicate": "RELATES_TO",
          "target": "e_c_icc",
          "targetId": "e_c_icc",
          "targetName": "International Code Council",
          "targetUri": "https://en.wikipedia.org/wiki/International_Code_Council",
          "confidence": "declared"
        }
      ]
    },
    {
      "entityId": "e_builder_walk_through",
      "@type": "Thing",
      "name": "The Builder Walk-Through and Punch List",
      "alternateName": "Builder walk-through",
      "description": "The blue-tape walk produces the punch list. Its value depends entirely on what gets written down and signed.",
      "hasChunks": [
        {
          "chunkId": "c_builder-walk-through",
          "text": "The builder walk-through establishes a shared, written list of what the buyer and the builder agree still needs to be completed or corrected before or shortly after closing. It is often called a blue-tape walk , after the painter's tape stuck on each blemish, or a new-home orientation , because the builder's representative also shows the buyer how the house works: shutoffs, the panel, filter locations, irrigation and appliance controls. The list that comes out of it is the punch list . No building code governs this walk.",
          "sourceUrl": "https://www.homepointinspection.com/builder-walk-through/",
          "pageTitle": "The Builder Walk-Through and Punch List | New Build Checkpoints",
          "publisher": "New Build Checkpoints",
          "contentType": "definition"
        }
      ],
      "relations": [
        {
          "predicate": "PART_OF",
          "target": "e_grp_finish",
          "targetId": "e_grp_finish",
          "targetName": "Completion",
          "confidence": "declared"
        },
        {
          "predicate": "RELATES_TO",
          "target": "e_c_fha",
          "targetId": "e_c_fha",
          "targetName": "Federal Housing Administration",
          "targetUri": "https://en.wikipedia.org/wiki/Federal_Housing_Administration",
          "confidence": "declared"
        }
      ]
    },
    {
      "entityId": "e_c_icc",
      "@type": "Organization",
      "name": "International Code Council",
      "description": "Publisher of the International Residential Code and the International Energy Conservation Code, the model codes that cities and counties adopt, amend and enforce on new houses.",
      "hasChunks": [
        {
          "chunkId": "c_e_c_icc",
          "text": "Publisher of the International Residential Code and the International Energy Conservation Code, the model codes that cities and counties adopt, amend and enforce on new houses.",
          "sourceUrl": "https://www.homepointinspection.com/guides/building-code-editions-and-local-amendments/",
          "pageTitle": "Building Code Editions and Local Amendments | New Build Checkpoints",
          "publisher": "New Build Checkpoints",
          "contentType": "definition"
        }
      ],
      "sameAs": "https://en.wikipedia.org/wiki/International_Code_Council"
    },
    {
      "entityId": "e_c_prestressed",
      "@type": "Concept",
      "name": "Prestressed concrete",
      "description": "Concrete placed in compression by tensioned steel. A post-tensioned slab on ground stretches its tendons days after the pour, and the elongation record documents it.",
      "hasChunks": [
        {
          "chunkId": "c_e_c_prestressed",
          "text": "Concrete placed in compression by tensioned steel. A post-tensioned slab on ground stretches its tendons days after the pour, and the elongation record documents it.",
          "sourceUrl": "https://www.homepointinspection.com/post-tension-stressing/",
          "pageTitle": "Post-Tension Slab Stressing | New Build Checkpoints",
          "publisher": "New Build Checkpoints",
          "contentType": "definition"
        }
      ],
      "sameAs": "https://en.wikipedia.org/wiki/Prestressed_concrete"
    },
    {
      "entityId": "e_c_co",
      "@type": "Concept",
      "name": "Certificate of occupancy",
      "description": "The building official's permission to occupy a completed building, issued after required inspections pass and stating the permit number, address and code edition.",
      "hasChunks": [
        {
          "chunkId": "c_e_c_co",
          "text": "The building official's permission to occupy a completed building, issued after required inspections pass and stating the permit number, address and code edition.",
          "sourceUrl": "https://www.homepointinspection.com/final-inspection-and-co/",
          "pageTitle": "The Final Inspection and Certificate of Occupancy | New Build Checkpoints",
          "publisher": "New Build Checkpoints",
          "contentType": "definition"
        }
      ],
      "sameAs": "https://en.wikipedia.org/wiki/Certificate_of_occupancy"
    },
    {
      "entityId": "e_c_blower",
      "@type": "Concept",
      "name": "Blower door",
      "description": "A calibrated fan used to depressurize a house to 50 pascals and measure its air leakage, reported as ACH50 under the energy code.",
      "hasChunks": [
        {
          "chunkId": "c_e_c_blower",
          "text": "A calibrated fan used to depressurize a house to 50 pascals and measure its air leakage, reported as ACH50 under the energy code.",
          "sourceUrl": "https://www.homepointinspection.com/energy-code-testing/",
          "pageTitle": "Blower Door and Duct Leakage Testing | New Build Checkpoints",
          "publisher": "New Build Checkpoints",
          "contentType": "definition"
        }
      ],
      "sameAs": "https://en.wikipedia.org/wiki/Blower_door"
    },
    {
      "entityId": "e_c_housewrap",
      "@type": "Concept",
      "name": "Housewrap",
      "description": "A water-resistive barrier sheet installed over wall sheathing behind the cladding and integrated with window flashing to drain water out of the wall.",
      "hasChunks": [
        {
          "chunkId": "c_e_c_housewrap",
          "text": "A water-resistive barrier sheet installed over wall sheathing behind the cladding and integrated with window flashing to drain water out of the wall.",
          "sourceUrl": "https://www.homepointinspection.com/windows-and-weather-barrier/",
          "pageTitle": "Windows, Flashing and Weather Barrier | New Build Checkpoints",
          "publisher": "New Build Checkpoints",
          "contentType": "definition"
        }
      ],
      "sameAs": "https://en.wikipedia.org/wiki/Housewrap"
    },
    {
      "entityId": "e_c_termite",
      "@type": "Concept",
      "name": "Termite",
      "description": "Subterranean termites reach wood through the soil; IRC Section R318 requires protection where risk is heavy, typically a soil treatment applied before the slab is poured.",
      "hasChunks": [
        {
          "chunkId": "c_e_c_termite",
          "text": "Subterranean termites reach wood through the soil; IRC Section R318 requires protection where risk is heavy, typically a soil treatment applied before the slab is poured.",
          "sourceUrl": "https://www.homepointinspection.com/termite-pretreatment/",
          "pageTitle": "Termite Pretreatment | New Build Checkpoints",
          "publisher": "New Build Checkpoints",
          "contentType": "definition"
        }
      ],
      "sameAs": "https://en.wikipedia.org/wiki/Termite"
    },
    {
      "entityId": "e_c_fha",
      "@type": "Organization",
      "name": "Federal Housing Administration",
      "description": "The HUD agency that insures mortgages, requiring the Builder's Certification (HUD-92541) and the Warranty of Completion of Construction (HUD-92544) on new construction.",
      "hasChunks": [
        {
          "chunkId": "c_e_c_fha",
          "text": "The HUD agency that insures mortgages, requiring the Builder's Certification (HUD-92541) and the Warranty of Completion of Construction (HUD-92544) on new construction.",
          "sourceUrl": "https://www.homepointinspection.com/guides/fha-and-usda-new-construction-requirements/",
          "pageTitle": "FHA and USDA Rules for Financing a New House | New Build Checkpoints",
          "publisher": "New Build Checkpoints",
          "contentType": "definition"
        }
      ],
      "sameAs": "https://en.wikipedia.org/wiki/Federal_Housing_Administration"
    },
    {
      "entityId": "e_tax_code",
      "@type": "Taxonomy",
      "name": "New House Stages Checked at a Code Inspection",
      "description": "The construction stages a building inspection is built around: the under-slab plumbing test, the foundation before concrete, the plumbing, electrical and HVAC rough-ins, the framing, the insulation where a city inspects it, the final grade and the final inspection that leads to the certificate of occupancy.",
      "hasChunks": [
        {
          "chunkId": "c_e_tax_code",
          "text": "The construction stages a building inspection is built around: the under-slab plumbing test, the foundation before concrete, the plumbing, electrical and HVAC rough-ins, the framing, the insulation where a city inspects it, the final grade and the final inspection that leads to the certificate of occupancy.",
          "sourceUrl": "https://www.homepointinspection.com/code-inspections/",
          "pageTitle": "New House Stages a Building Inspector Checks | New Build Checkpoints",
          "publisher": "New Build Checkpoints",
          "contentType": "definition"
        }
      ],
      "relations": [
        {
          "predicate": "INCLUDES",
          "target": "e_under_slab_plumbing",
          "targetId": "e_under_slab_plumbing",
          "targetName": "Under-Slab Plumbing and the Water Test",
          "confidence": "declared"
        },
        {
          "predicate": "INCLUDES",
          "target": "e_foundation_pre_pour",
          "targetId": "e_foundation_pre_pour",
          "targetName": "The Foundation Pre-Pour Inspection",
          "confidence": "declared"
        },
        {
          "predicate": "INCLUDES",
          "target": "e_framing_and_bracing",
          "targetId": "e_framing_and_bracing",
          "targetName": "The Framing Inspection and Wall Bracing",
          "confidence": "declared"
        },
        {
          "predicate": "INCLUDES",
          "target": "e_plumbing_top_out",
          "targetId": "e_plumbing_top_out",
          "targetName": "Plumbing Top-Out and the Gas Line Test",
          "confidence": "declared"
        },
        {
          "predicate": "INCLUDES",
          "target": "e_electrical_rough_in",
          "targetId": "e_electrical_rough_in",
          "targetName": "The Electrical Rough-In Inspection",
          "confidence": "declared"
        },
        {
          "predicate": "INCLUDES",
          "target": "e_hvac_rough_in",
          "targetId": "e_hvac_rough_in",
          "targetName": "HVAC Rough-In and Equipment Sizing",
          "confidence": "declared"
        },
        {
          "predicate": "INCLUDES",
          "target": "e_insulation_and_air_sealing",
          "targetId": "e_insulation_and_air_sealing",
          "targetName": "Insulation and Air Sealing Before Drywall",
          "confidence": "declared"
        },
        {
          "predicate": "INCLUDES",
          "target": "e_final_grading_and_drainage",
          "targetId": "e_final_grading_and_drainage",
          "targetName": "Final Grading and Drainage",
          "confidence": "declared"
        },
        {
          "predicate": "INCLUDES",
          "target": "e_final_inspection_and_co",
          "targetId": "e_final_inspection_and_co",
          "targetName": "The Final Inspection and Certificate of Occupancy",
          "confidence": "declared"
        }
      ]
    },
    {
      "entityId": "e_tax_record",
      "@type": "Taxonomy",
      "name": "New House Stages Proven Only by a Document",
      "description": "The construction stages with no code inspection aimed at them, whose evidence is a survey, certificate, record or test: the form board survey, the termite treatment, the post-tension elongation record, the roof and window details, the brick veneer, the energy tests and the builder walk-through punch list.",
      "hasChunks": [
        {
          "chunkId": "c_e_tax_record",
          "text": "The construction stages with no code inspection aimed at them, whose evidence is a survey, certificate, record or test: the form board survey, the termite treatment, the post-tension elongation record, the roof and window details, the brick veneer, the energy tests and the builder walk-through punch list.",
          "sourceUrl": "https://www.homepointinspection.com/documented-stages/",
          "pageTitle": "New House Stages Proven Only by a Document | New Build Checkpoints",
          "publisher": "New Build Checkpoints",
          "contentType": "definition"
        }
      ],
      "relations": [
        {
          "predicate": "INCLUDES",
          "target": "e_lot_survey_and_form_board",
          "targetId": "e_lot_survey_and_form_board",
          "targetName": "Form Board Survey and Staking",
          "confidence": "declared"
        },
        {
          "predicate": "INCLUDES",
          "target": "e_termite_pretreatment",
          "targetId": "e_termite_pretreatment",
          "targetName": "Termite Pretreatment",
          "confidence": "declared"
        },
        {
          "predicate": "INCLUDES",
          "target": "e_post_tension_stressing",
          "targetId": "e_post_tension_stressing",
          "targetName": "Post-Tension Slab Stressing",
          "confidence": "declared"
        },
        {
          "predicate": "INCLUDES",
          "target": "e_roof_dry_in",
          "targetId": "e_roof_dry_in",
          "targetName": "Roof Dry-In: Underlayment and Flashing",
          "confidence": "declared"
        },
        {
          "predicate": "INCLUDES",
          "target": "e_windows_and_weather_barrier",
          "targetId": "e_windows_and_weather_barrier",
          "targetName": "Windows, Flashing and Weather Barrier",
          "confidence": "declared"
        },
        {
          "predicate": "INCLUDES",
          "target": "e_brick_veneer",
          "targetId": "e_brick_veneer",
          "targetName": "Brick Veneer: Weep Holes, Ties and Air Space",
          "confidence": "declared"
        },
        {
          "predicate": "INCLUDES",
          "target": "e_energy_code_testing",
          "targetId": "e_energy_code_testing",
          "targetName": "Blower Door and Duct Leakage Testing",
          "confidence": "declared"
        },
        {
          "predicate": "INCLUDES",
          "target": "e_builder_walk_through",
          "targetId": "e_builder_walk_through",
          "targetName": "The Builder Walk-Through and Punch List",
          "confidence": "declared"
        }
      ]
    },
    {
      "entityId": "e_grp_site",
      "@type": "Taxonomy",
      "name": "Site and foundation",
      "description": "The lot, the soil treatment and everything under and inside the slab: one of the four phases of building a new house, each of which hides the one before it.",
      "hasChunks": [
        {
          "chunkId": "c_e_grp_site",
          "text": "The lot, the soil treatment and everything under and inside the slab: one of the four phases of building a new house, each of which hides the one before it.",
          "sourceUrl": "https://www.homepointinspection.com/phases/",
          "pageTitle": "The Four Phases of Building a New House | New Build Checkpoints",
          "publisher": "New Build Checkpoints",
          "contentType": "definition"
        }
      ],
      "relations": [
        {
          "predicate": "INCLUDES",
          "target": "e_lot_survey_and_form_board",
          "targetId": "e_lot_survey_and_form_board",
          "targetName": "Form Board Survey and Staking",
          "confidence": "declared"
        },
        {
          "predicate": "INCLUDES",
          "target": "e_termite_pretreatment",
          "targetId": "e_termite_pretreatment",
          "targetName": "Termite Pretreatment",
          "confidence": "declared"
        },
        {
          "predicate": "INCLUDES",
          "target": "e_under_slab_plumbing",
          "targetId": "e_under_slab_plumbing",
          "targetName": "Under-Slab Plumbing and the Water Test",
          "confidence": "declared"
        },
        {
          "predicate": "INCLUDES",
          "target": "e_foundation_pre_pour",
          "targetId": "e_foundation_pre_pour",
          "targetName": "The Foundation Pre-Pour Inspection",
          "confidence": "declared"
        },
        {
          "predicate": "INCLUDES",
          "target": "e_post_tension_stressing",
          "targetId": "e_post_tension_stressing",
          "targetName": "Post-Tension Slab Stressing",
          "confidence": "declared"
        }
      ]
    },
    {
      "entityId": "e_grp_shell",
      "@type": "Taxonomy",
      "name": "Structure and shell",
      "description": "The frame, the roof and the layers that keep water out of the walls: one of the four phases of building a new house, each of which hides the one before it.",
      "hasChunks": [
        {
          "chunkId": "c_e_grp_shell",
          "text": "The frame, the roof and the layers that keep water out of the walls: one of the four phases of building a new house, each of which hides the one before it.",
          "sourceUrl": "https://www.homepointinspection.com/phases/",
          "pageTitle": "The Four Phases of Building a New House | New Build Checkpoints",
          "publisher": "New Build Checkpoints",
          "contentType": "definition"
        }
      ],
      "relations": [
        {
          "predicate": "INCLUDES",
          "target": "e_framing_and_bracing",
          "targetId": "e_framing_and_bracing",
          "targetName": "The Framing Inspection and Wall Bracing",
          "confidence": "declared"
        },
        {
          "predicate": "INCLUDES",
          "target": "e_roof_dry_in",
          "targetId": "e_roof_dry_in",
          "targetName": "Roof Dry-In: Underlayment and Flashing",
          "confidence": "declared"
        },
        {
          "predicate": "INCLUDES",
          "target": "e_windows_and_weather_barrier",
          "targetId": "e_windows_and_weather_barrier",
          "targetName": "Windows, Flashing and Weather Barrier",
          "confidence": "declared"
        },
        {
          "predicate": "INCLUDES",
          "target": "e_brick_veneer",
          "targetId": "e_brick_veneer",
          "targetName": "Brick Veneer: Weep Holes, Ties and Air Space",
          "confidence": "declared"
        }
      ]
    },
    {
      "entityId": "e_grp_systems",
      "@type": "Taxonomy",
      "name": "Systems rough-in",
      "description": "Plumbing, wiring, ducts and insulation inside the walls, and the tests that measure them: one of the four phases of building a new house, each of which hides the one before it.",
      "hasChunks": [
        {
          "chunkId": "c_e_grp_systems",
          "text": "Plumbing, wiring, ducts and insulation inside the walls, and the tests that measure them: one of the four phases of building a new house, each of which hides the one before it.",
          "sourceUrl": "https://www.homepointinspection.com/phases/",
          "pageTitle": "The Four Phases of Building a New House | New Build Checkpoints",
          "publisher": "New Build Checkpoints",
          "contentType": "definition"
        }
      ],
      "relations": [
        {
          "predicate": "INCLUDES",
          "target": "e_plumbing_top_out",
          "targetId": "e_plumbing_top_out",
          "targetName": "Plumbing Top-Out and the Gas Line Test",
          "confidence": "declared"
        },
        {
          "predicate": "INCLUDES",
          "target": "e_electrical_rough_in",
          "targetId": "e_electrical_rough_in",
          "targetName": "The Electrical Rough-In Inspection",
          "confidence": "declared"
        },
        {
          "predicate": "INCLUDES",
          "target": "e_hvac_rough_in",
          "targetId": "e_hvac_rough_in",
          "targetName": "HVAC Rough-In and Equipment Sizing",
          "confidence": "declared"
        },
        {
          "predicate": "INCLUDES",
          "target": "e_insulation_and_air_sealing",
          "targetId": "e_insulation_and_air_sealing",
          "targetName": "Insulation and Air Sealing Before Drywall",
          "confidence": "declared"
        },
        {
          "predicate": "INCLUDES",
          "target": "e_energy_code_testing",
          "targetId": "e_energy_code_testing",
          "targetName": "Blower Door and Duct Leakage Testing",
          "confidence": "declared"
        }
      ]
    },
    {
      "entityId": "e_grp_finish",
      "@type": "Taxonomy",
      "name": "Completion",
      "description": "Grading, the final inspection and the walk-through that close out the build: one of the four phases of building a new house, each of which hides the one before it.",
      "hasChunks": [
        {
          "chunkId": "c_e_grp_finish",
          "text": "Grading, the final inspection and the walk-through that close out the build: one of the four phases of building a new house, each of which hides the one before it.",
          "sourceUrl": "https://www.homepointinspection.com/phases/",
          "pageTitle": "The Four Phases of Building a New House | New Build Checkpoints",
          "publisher": "New Build Checkpoints",
          "contentType": "definition"
        }
      ],
      "relations": [
        {
          "predicate": "INCLUDES",
          "target": "e_final_grading_and_drainage",
          "targetId": "e_final_grading_and_drainage",
          "targetName": "Final Grading and Drainage",
          "confidence": "declared"
        },
        {
          "predicate": "INCLUDES",
          "target": "e_final_inspection_and_co",
          "targetId": "e_final_inspection_and_co",
          "targetName": "The Final Inspection and Certificate of Occupancy",
          "confidence": "declared"
        },
        {
          "predicate": "INCLUDES",
          "target": "e_builder_walk_through",
          "targetId": "e_builder_walk_through",
          "targetName": "The Builder Walk-Through and Punch List",
          "confidence": "declared"
        }
      ]
    },
    {
      "entityId": "e_p_home",
      "@type": "Document",
      "name": "New House Construction Stages, Checked and Explained",
      "description": "What gets inspected at each stage of building a new house, what each stage hides, and the documents that prove it, from the slab to the final walk-through.",
      "hasChunks": [
        {
          "chunkId": "c_e_p_home",
          "text": "A new house is built in an order that buries each stage under the next: the slab covers the plumbing and the termite treatment, the brick covers the window flashing, the drywall covers the framing, the wiring, the pipes and the insulation. This reference takes the 17 stages of a typical slab-on-grade house, says who checks each one and when, and answers the question a buyer cares about most: once the house is finished, can this work still be checked, or is the paperwork the only evidence left?",
          "sourceUrl": "https://www.homepointinspection.com/",
          "pageTitle": "New House Construction Stages, Checked and Explained",
          "publisher": "New Build Checkpoints",
          "contentType": "page"
        }
      ]
    },
    {
      "entityId": "e_p_stages",
      "@type": "Document",
      "name": "Every Stage of Building a New House, Explained",
      "description": "All 17 stages of building a new house, from the lot survey to the walk-through, and whether each can still be checked after move-in.",
      "hasChunks": [
        {
          "chunkId": "c_e_p_stages",
          "text": "All 17 construction stages on this site, each with its answer stated up front: still checkable after move-in, partly hidden after completion, or hidden once the next stage starts.",
          "sourceUrl": "https://www.homepointinspection.com/stages/",
          "pageTitle": "Every Stage of Building a New House, Explained",
          "publisher": "New Build Checkpoints",
          "contentType": "page"
        }
      ]
    },
    {
      "entityId": "e_p_guides",
      "@type": "Document",
      "name": "Guides to Building and Inspecting a New House",
      "description": "Guides to new construction: what inspectors check, Texas rules outside city limits, a stage checklist, the cover-up point, closing documents and more.",
      "hasChunks": [
        {
          "chunkId": "c_e_p_guides",
          "text": "The stage pages answer what happens at each step of a new house and what it hides. These guides answer the questions around them: what a city building inspector actually checks, the three inspections Texas requires outside city limits, which code edition applied, a stage-by-stage checklist, how long each stage takes, the cover-up point, the documents to collect at closing, the Texas construction defect notice process, and what FHA and USDA require.",
          "sourceUrl": "https://www.homepointinspection.com/guides/",
          "pageTitle": "Guides to Building and Inspecting a New House",
          "publisher": "New Build Checkpoints",
          "contentType": "page"
        }
      ]
    },
    {
      "entityId": "e_p_guides_who_inspects_a_new_house",
      "@type": "Document",
      "name": "Who Inspects a New House, and When",
      "description": "Who checks a new house during construction, what each party is responsible for, where the gaps are, and how city and county rules differ in Texas.",
      "hasChunks": [
        {
          "chunkId": "c_e_p_guides_who_inspects_a_new_house",
          "text": "Several different people check a new house, each for a different reason, and none of them checks everything.",
          "sourceUrl": "https://www.homepointinspection.com/guides/who-inspects-a-new-house/",
          "pageTitle": "Who Inspects a New House, and When | New Build Checkpoints",
          "publisher": "New Build Checkpoints",
          "contentType": "page"
        }
      ]
    },
    {
      "entityId": "e_p_guides_the_build_sequence",
      "@type": "Document",
      "name": "The New House Build Sequence, Stage by Stage",
      "description": "The order of construction for a new house, from survey and slab to final, which stages hide which work, how long they take, and when to look.",
      "hasChunks": [
        {
          "chunkId": "c_e_p_guides_the_build_sequence",
          "text": "A house is built in an order that buries each stage under the next, and the order is the key to knowing when to look.",
          "sourceUrl": "https://www.homepointinspection.com/guides/the-build-sequence/",
          "pageTitle": "The New House Build Sequence, Stage by Stage",
          "publisher": "New Build Checkpoints",
          "contentType": "page"
        }
      ]
    },
    {
      "entityId": "e_p_guides_the_new_house_paper_trail",
      "@type": "Document",
      "name": "The Paper Trail of a New House",
      "description": "The documents that prove how a new house was built, why they matter at closing, in a warranty claim and at resale, and the rules behind them.",
      "hasChunks": [
        {
          "chunkId": "c_e_p_guides_the_new_house_paper_trail",
          "text": "By closing day most of a new house is hidden, and its paperwork becomes the only evidence of how it was built.",
          "sourceUrl": "https://www.homepointinspection.com/guides/the-new-house-paper-trail/",
          "pageTitle": "The Paper Trail of a New House | New Build Checkpoints",
          "publisher": "New Build Checkpoints",
          "contentType": "page"
        }
      ]
    },
    {
      "entityId": "e_p_guides_what_a_city_building_inspector_checks",
      "@type": "Document",
      "name": "What a City Building Inspector Checks",
      "description": "The inspections a building department makes on a new house, what each one is for, how long the inspector has, and what a passed inspection does not mean.",
      "hasChunks": [
        {
          "chunkId": "c_e_p_guides_what_a_city_building_inspector_checks",
          "text": "A code inspector checks a new house against minimum safety rules at a handful of moments, which is valuable and narrower than most buyers assume.",
          "sourceUrl": "https://www.homepointinspection.com/guides/what-a-city-building-inspector-checks/",
          "pageTitle": "What a City Building Inspector Checks | New Build Checkpoints",
          "publisher": "New Build Checkpoints",
          "contentType": "page"
        }
      ]
    },
    {
      "entityId": "e_p_guides_new_construction_outside_city_limits",
      "@type": "Document",
      "name": "New Construction Outside City Limits in Texas",
      "description": "Texas Local Government Code 233.153-.154: the code for new houses in unincorporated areas, the three required inspections, and who may do them.",
      "hasChunks": [
        {
          "chunkId": "c_e_p_guides_new_construction_outside_city_limits",
          "text": "Outside a city&#x27;s limits, Texas law still requires three inspections on a new house, but the builder chooses and hires the inspector.",
          "sourceUrl": "https://www.homepointinspection.com/guides/new-construction-outside-city-limits/",
          "pageTitle": "New Construction Outside City Limits in Texas",
          "publisher": "New Build Checkpoints",
          "contentType": "page"
        }
      ]
    },
    {
      "entityId": "e_p_guides_new_construction_inspection_checklist",
      "@type": "Document",
      "name": "New Construction Inspection Checklist",
      "description": "A stage-by-stage checklist for a new house: what to look at before the pour, before drywall and before closing, and which documents to ask for at each step.",
      "hasChunks": [
        {
          "chunkId": "c_e_p_guides_new_construction_inspection_checklist",
          "text": "Each stage of a new house has a short list of things worth seeing before they disappear, and a document worth asking for.",
          "sourceUrl": "https://www.homepointinspection.com/guides/new-construction-inspection-checklist/",
          "pageTitle": "New Construction Inspection Checklist | New Build Checkpoints",
          "publisher": "New Build Checkpoints",
          "contentType": "page"
        }
      ]
    },
    {
      "entityId": "e_p_guides_how_long_each_construction_stage_takes",
      "@type": "Document",
      "name": "How Long Each Stage of a New House Takes",
      "description": "Census and NAHB data on how long a new house takes, from permit to completion, and how many weeks each stage lasts, with what the numbers do and do not mean.",
      "hasChunks": [
        {
          "chunkId": "c_e_p_guides_how_long_each_construction_stage_takes",
          "text": "A typical new house takes about nine months from permit to completion, and the inspection windows inside that schedule are measured in days.",
          "sourceUrl": "https://www.homepointinspection.com/guides/how-long-each-construction-stage-takes/",
          "pageTitle": "How Long Each Stage of a New House Takes | New Build Checkpoints",
          "publisher": "New Build Checkpoints",
          "contentType": "page"
        }
      ]
    },
    {
      "entityId": "e_p_guides_the_cover_up_point",
      "@type": "Document",
      "name": "The Cover-Up Point in New Construction",
      "description": "Which parts of a new house are hidden forever at each stage, why that changes the cost of fixing a defect, and which records stand in for what you cannot see.",
      "hasChunks": [
        {
          "chunkId": "c_e_p_guides_the_cover_up_point",
          "text": "Every stage of a new house buries the one before it, and the cost of fixing a defect jumps the moment it is covered.",
          "sourceUrl": "https://www.homepointinspection.com/guides/the-cover-up-point/",
          "pageTitle": "The Cover-Up Point in New Construction | New Build Checkpoints",
          "publisher": "New Build Checkpoints",
          "contentType": "page"
        }
      ]
    },
    {
      "entityId": "e_p_guides_documents_to_collect_at_closing",
      "@type": "Document",
      "name": "Documents to Collect When Buying a New House",
      "description": "The paper trail a new house should come with: certificate of occupancy, inspections, surveys, termite and foundation records, energy certificate.",
      "hasChunks": [
        {
          "chunkId": "c_e_p_guides_documents_to_collect_at_closing",
          "text": "Most of a new house is hidden by the time you close, so the paperwork is the only evidence of how it was built.",
          "sourceUrl": "https://www.homepointinspection.com/guides/documents-to-collect-at-closing/",
          "pageTitle": "Documents to Collect When Buying a New House",
          "publisher": "New Build Checkpoints",
          "contentType": "page"
        }
      ]
    },
    {
      "entityId": "e_p_guides_texas_construction_defect_notice",
      "@type": "Document",
      "name": "Texas Construction Defect Notice Under the RCLA",
      "description": "The Texas Residential Construction Liability Act in plain terms: the 60-day written notice, the builder's chance to inspect and offer repair.",
      "hasChunks": [
        {
          "chunkId": "c_e_p_guides_texas_construction_defect_notice",
          "text": "Before a Texas homeowner can sue a builder over a construction defect, the law requires written notice and a chance for the builder to inspect and offer a repair.",
          "sourceUrl": "https://www.homepointinspection.com/guides/texas-construction-defect-notice/",
          "pageTitle": "Texas Construction Defect Notice Under the RCLA",
          "publisher": "New Build Checkpoints",
          "contentType": "page"
        }
      ]
    },
    {
      "entityId": "e_p_about",
      "@type": "Document",
      "name": "About New Build Checkpoints",
      "description": "Who publishes New Build Checkpoints, what it rests on, how its pages are researched and dated, and how it handles its one link to the publisher.",
      "hasChunks": [
        {
          "chunkId": "c_e_p_about",
          "text": "New Build Checkpoints is a reference on one question: what gets checked at each stage of building a new house, and what can still be checked once it is finished. It covers 17 stages of a typical slab-on-grade house, from the form board survey and the termite pretreatment to the final inspection and the builder walk-through. For each one it states who checks it and under what rule, what the stage hides, and which document survives as evidence. Texas rules are the working examples where Texas differs from the model code.",
          "sourceUrl": "https://www.homepointinspection.com/about/",
          "pageTitle": "About New Build Checkpoints",
          "publisher": "New Build Checkpoints",
          "contentType": "page"
        }
      ]
    },
    {
      "entityId": "e_p_contact",
      "@type": "Document",
      "name": "Contact",
      "description": "Send a correction or a question about the reference material. No plans or reports reviewed, no referrals, no advice on a particular house.",
      "hasChunks": [
        {
          "chunkId": "c_e_p_contact",
          "text": "This page is for corrections to the reference material and for questions about what a construction stage is or what a document records. It is not a way to reach an inspector, a builder or a lender, and no one here will review plans, photographs, reports or documents about a particular house.",
          "sourceUrl": "https://www.homepointinspection.com/contact/",
          "pageTitle": "Contact | New Build Checkpoints",
          "publisher": "New Build Checkpoints",
          "contentType": "page"
        }
      ]
    }
  ]
}